laitimes

Huicheng: Promote the high-quality development of transportation in the urban area, and create a landscape road to get rich through internal and external connections

author:Huicheng release

The construction site of the No. 1 and No. 2 bridges in the Jinshan Lake area is in full swing, with two bridges spanning the lake to open up the connecting channel between the island in the center of Jinshan Lake and the outside world......

At present, the Huicheng District Transportation Branch is closely focusing on the promotion of the "Millions and Thousands of Projects" to promote the high-quality development of Huicheng Transportation. In accordance with the concept of urban integration, the bureau strives to speed up the construction of transportation projects, continuously improve the pattern of internal and external traffic in the whole region, and add assistance to the construction of four Huicheng cities and the comprehensive construction of a first-class central area.

Promote the construction of key projects

The No. 1 and No. 2 bridges in the Jinshan Lake area were completed and opened to traffic at the end of June

The reporter recently visited the construction site of the No. 1 bridge and No. 2 bridge project in the Jinshan Lake area in the urban area, only to see a busy construction scene, workers are working on the pedestrian landscape bridge and bridge deck pavement project, and the two Tan Arch Bridges under construction have begun to take shape, across the Jinshan Lake lake.

Huicheng: Promote the high-quality development of transportation in the urban area, and create a landscape road to get rich through internal and external connections

The No. 1 bridge in the Jinshan Lake area is under construction.

Li Jianquan, director of the Transportation Planning and Construction Affairs Department of the Transportation Affairs Center of Huicheng District, introduced that the construction project of the No. 1 and No. 2 bridges in the Jinshan Lake area is a key construction project in the city, with a total investment of about 540 million yuan. The bridge road grade is an urban secondary trunk road, with a design speed of 40 kilometers per hour, and a two-way six-lane road. There are 3-meter-wide pedestrian landscape bridges on each side of the main bridge, which is convenient for pedestrians to enjoy the beautiful scenery of Jinshan Lake. At present, about 90% of the construction volume of the project has been completed, and the main bridge has been closed at the end of 2023, and it is planned to be completed and opened to traffic by the end of June this year. "After the completion and opening of these two bridges, they will connect the Maidi area on the south bank of the river with the Jinshan Lake Island and Hushan area, effectively alleviating the traffic pressure on the Third Ring Road, improving the traffic network in the area, and making it more convenient for citizens to travel. Li Jianquan said.

Huicheng: Promote the high-quality development of transportation in the urban area, and create a landscape road to get rich through internal and external connections

The construction site of the No. 2 bridge in the Jinshan Lake area.

In recent years, Huicheng District has adhered to the integration of urban areas, worked together to speed up the construction of external channels, and focused on connecting major arteries. At present, the Huicheng District Transportation Branch is actively working with municipal departments to vigorously promote the "Feng" traffic main framework Huixia Expressway, Huizhao Expressway, G324 northbound and other major external passages to accelerate the completion and opening to traffic. At the same time, it actively coordinates with municipal departments to speed up major transportation projects such as the airport expressway and the rapid development of Huize Avenue, and accelerates the realization of a 15-minute expressway in the central area, laying an important foundation for Huicheng to integrate into the overall development of the "half-hour economic life circle" of Guangzhou and Shenzhen and the modern comprehensive transportation system of the Greater Bay Area.

Huang Baiqiang, head of the planning and engineering unit of the Huicheng District Transportation Branch, introduced that the bureau will continue to promote the progress of key transportation projects, one is to improve the layout of the municipal railway, promote the city-wide transformation of the Huicheng railway, form a fast channel from Huicheng to Daya Bay, and speed up the construction of Shenzhen-Huizhou intercity; the second is to plan to build a "two rings and ten rays" rapid entry and exit system around the central urban area; the third is to focus on promoting the construction of major industrial platform roads in the Ma'an area of Jiangdong District, and coordinate the improvement of Huizhou North Railway Station, The construction of supporting roads such as the hub area of Huizhou South Railway Station and Hengli Industrial Park will build transportation that satisfies the people and provide strong support for the high-quality development of Huicheng.

Improve the transportation network of the park

The construction of the main line of Jiangbin Road has been completed

It is expected that Jiangbin Road in Shuikou will be completed and opened to traffic in the first half of this year. Walking along the main road that has been built, you can enjoy the beautiful scenery of the Dongjiang River along the way.

The Jiangbin Road project is a combination of embankments and roads, with a total length of 7.07 kilometers of main line, two-way four-lane, a design speed of 40 kilometers per hour, a new embankment of 1.75 kilometers, and two connecting roads with a length of 1.22 kilometers. As a secondary road in the city, the road connects the CITIC Bridge and the Goose City Bridge under construction, and the construction of the main line of the road has been completed, and the connecting road is steadily advancing.

Huicheng: Promote the high-quality development of transportation in the urban area, and create a landscape road to get rich through internal and external connections

The main road of Jiangbin Road has been completed.

In order to facilitate the public to enjoy the scenery, 3 Huimin parking lots have also been set up along Jiangbin Road, with a total of 302 parking spaces. Mr. Yang, a Shuikou resident who is walking on the embankment of Jiangbin Road with his family, lamented that since the construction of Jiangbin Road, he has witnessed the transformation of the road from potholes to "landscape road". "It used to be a river embankment, full of potholes and weeds. Seeing that this road is now so wide and beautiful, and there is a parking lot, it is much more convenient for us to come to the Dongjiang River to see the scenery!"

"After the opening of Jiangbin Road, it will improve the transportation network of the entire Shuikou area, alleviate the traffic pressure of Provincial Highway 120, further improve the transportation infrastructure of Dongjiangwan Industrial Park, and promote the high-quality development of the park. Wang Chao, the person in charge of the Jiangbin Road construction unit, said.

It is understood that in order to promote Huicheng High-tech Zone to speed up the construction of a "external and internal" traffic network, the Huicheng District Transportation Branch strives to open up the road network of the park, comprehensively improve the traffic development environment inside and outside the industrial park, so that the industrial park can quickly integrate into the city's transportation development axis, and realize the speed connection, speed communication and speed access between the central area, important scenic spots, industrial parks and the northern mountainous areas.

As the core park of Huicheng High-tech Zone, the construction of the external road network of Dongjiangwan Industrial Park is being accelerated, including Shuikou Jiangbin Road, Yanjiang Road Phase II, some roads in Xinle Industrial Zone of Dongjiangwan Industrial Park, Mayong Road, Mashui Road and other projects under construction, and the preliminary work of transportation projects such as Longhu Avenue of Dongjiangwan Industrial Park and the co-linear section under the bridge of Dongjiangwan Industrial Park of Highway No. 1 has been accelerated. At the same time, the construction of roads such as the municipal engineering of the Lugang area of the Dongjiangwan Industrial Park and the municipal engineering of the Hengli Industrial Park is also accelerating, laying a solid transportation foundation for the development of the park.

Rural road construction has been upgraded

Daliang Road was rated as the most beautiful rural road

From urban to rural, road construction has also been upgraded. Walking along the neat and spacious asphalt road into Daliang Village, Ruhu Town, the road is shaded by green trees, street lamps are arranged, and farmhouse restaurants are dotted along the roadside, attracting guests who come to seek delicious food. This road, called Daliang Road, was rated as the most beautiful rural road in the city in 2023.

In terms of rural road construction, the transportation and highway departments have upgraded the single-lane to two-lane and carried out the construction of the most beautiful rural roads, so as to make it more convenient for farmers to enter and exit and produce and live along the line, and also let urban people come in, which not only narrows the gap between urban and rural areas, improves the happiness of villagers, but also adds help to rural revitalization.

"The construction of this road has played a great role in the development of Daliang Village and Ruhu Town, especially the development of industries along the route. Deng Longfei, an engineer of the Construction and Road Affairs Department of Ruhu Town, introduced that after the repair of Daliang Road, industries such as ecological picking gardens, agarwood gardens, photovoltaic power generation projects and pig bases along the line continue to flourish, and many tourism resources such as characteristic farmhouses, boutique homestays, hiking and cycling are strung together into a chain, and the integrated development of local agricultural, cultural, tourism and sports industries has comprehensively promoted rural revitalization.

Huicheng: Promote the high-quality development of transportation in the urban area, and create a landscape road to get rich through internal and external connections

Daliang Road in Lake Yuhu was rated as the most beautiful rural road.

The reporter learned from the Huicheng District Transportation Bureau that during the "13th Five-Year Plan" period, Huicheng District completed the construction of about 450 kilometers of village roads with hard bottoms, and 142 administrative villages have been 100% open to passenger traffic. Next, Huicheng will promote the construction of rural highway single-lane to dual-lane, county road transformation, dangerous bridge transformation, village road security and other projects, orderly implement the "Green Beauty Four Rings" plan, accelerate the improvement of the rural highway operation deep integration development mechanism, and inject new momentum into rural revitalization.

Source: Huizhou Daily (reporter Peng Hongxia, special correspondent Zhou Wenmei, correspondent Wu Wenxi, Feng Xuehui), please indicate.

Read on