Intersection of Bose Road and Hetang Road
It is about 30 meters to the north
A reminder of the semi-enclosed construction
Due to the need for the new installation of two sets of 2*250kVA infrastructure projects, from March 27, 2024 to March 28, 2024, the lanes near the intersection of Boshi Road and Hetang Road to the north of 30 meters will be subject to sectional one-way semi-closed construction.
Construction arrangement:
On March 27, 2024, two motorized lanes and one non-motorized lane on the east side of Boshi Road (about 30 meters north of the intersection of Boshi Road and Hetang Road) will be closed.
(Click on the image to enlarge it)
On March 28, 2024, two motorized lanes and one non-motorized lane on the west side of Boshi Road (near the intersection of Boshi Road and Hetang Road about 30 meters to the north) will be closed.
(Click on the image to enlarge it)
During the road closure period, passing vehicles are requested to slow down according to the traffic signs and obey the instructions of the on-site traffic management personnel.
Traffic Police Brigade of Dongyang Public Security Bureau
March 22, 2024
Editor: Lu Anran
Second trial: Jiang Zhi
Final review: Wang Zhonghua