1. Multiple choice questions (25 questions in total, 50 points in total)

1. According to the provisions of the Government Procurement Law on the qualifications of suppliers, the following is correct ( ).

A. A natural person cannot become a supplier of government procurement.

B. A branch office cannot become a government procurement supplier.

C. Subsidiaries cannot become government procurement suppliers.

D. Individually-owned businesses cannot become government procurement suppliers.

Correct Answer: B

2. If the procurement quota is above the standard and the procurement of goods and services below 10,000 yuan and the engineering procurement project below 10,000 yuan are suitable for small and medium-sized enterprises, the purchaser shall procure them specifically for small and medium-sized enterprises.

A.100;200

B.200;400

C.300;600

D.400;800

Correct Answer: B

3. The performance period of the government purchase service contract shall generally not exceed one year; under the premise of budget guarantee, the government purchase service contract with a performance period of no more than ( ) years may be signed for the government purchase service project with relatively fixed purchase content, strong continuity, stable funding sources, and small price changes.

A.2

B.3

C.5

D.8

Correct Answer: B

4. The list of government procurement items for energy-saving products includes computer equipment, showers and other major product items, and the list of government procurement items for environmental labeling products includes computer equipment, plastic products and other major product items.

A.11;20

B.20;35

C.30;50

D.18;50

Correct answer: D

5. For the following government procurement projects, the public shall be solicited for comments on the determination of procurement needs ( ).

A. Government procurement of services

B. Procurement projects with complex technology or special nature

C. Procurement items that cannot determine detailed specifications or specific requirements

D. Public service projects provided by the government to the public

Correct answer: D

6. In accordance with the provisions of the Government Procurement Law, if the purchaser or procurement agency fails to respond to the supplier's question within the prescribed time, the supplier ( ).

A. Complaints may be lodged with the procurer's competent budget unit within 15 working days after the expiration of the reply period.

B. Complaints may be made to the competent budget unit of the purchaser within 30 working days after the expiration of the reply period.

C. Complaints may be made to the government procurement supervision and management department at the same level within 15 working days after the expiration of the reply period.

D. Complaints may be made to the government procurement supervision and management department at the same level within 30 working days after the expiration of the reply period.

Correct Answer: C

7. Government procurement quota standards, government procurement projects that belong to the local budget, shall be determined and published by ( ).

A. The people's governments of provinces, autonomous regions and municipalities directly under the Central Government

B. The people's governments of provinces, autonomous regions, and municipalities directly under the Central Government or their authorized institutions

C. The financial departments of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government

D. The financial departments of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government or their authorized institutions

Correct Answer: B

8. Government procurement shall follow the principles of openness and transparency, fair competition, impartiality, and ( ).

A. The principle of doing things according to law

B. Principle of efficiency

C. Principle of efficiency

D. The principle of good faith

Correct answer: D

9. The retention period of procurement documents for government procurement projects shall be at least ( ) years from the date of completion of procurement.

A. 5 years

B. 10 years

C.15 years

D. 20 years

Correct Answer: C

10. The specific scope and content of government procurement of services are to be managed by a guiding catalog, and the guiding catalog is to be disclosed in accordance with law. The service items included in the guiding catalogue of government procurement of services, ( ), may implement government procurement of services.

A. The work needs of the unit

B. With the consent of the competent unit

C. Budgeted scheduled

D. The unit leader agrees

Correct Answer: C

11. In a government procurement supervision and inspection, it is found that a supplier has offered bribes to a purchaser or a procurement agency, and in accordance with the Government Procurement Law, the scope of the fine imposed on the supplier is ( ).

A. Between 50,000 yuan and 100,000 yuan

B. Between 100,000 yuan and 200,000 yuan

C. The purchase amount is between 5 and 10 thousandths

D. Between 5% and 10% of the purchase amount

Correct Answer: C

12. For government procurement projects that belong to the central budget, the centralized procurement catalogue shall be determined and published by ( ).

A. Department of State

B. General Office of the State Council

C. Ministry of Finance

D. Administration of State Organs

Correct Answer: A

13. With regard to the procurement requirements for framework agreements, the following statement is incorrect ( ).

A. Meet the actual needs of purchasers and service users, meet market supply conditions and market fairness standards, and promote competition while ensuring functionality, performance and necessary procurement requirements.

B. Comply with relevant provisions such as budget standards and asset allocation standards, strictly economize, and shall not exceed standard procurement.

C. In accordance with the "Classification Catalogue of Government Procurement Items", refine the procurement subject matter to the bottom of the item, and subdivide the procurement needs of different grades, specifications or standards, and reasonably set up the procurement package.

D. The first stage of framework agreement procurement is only to determine the shortlisted suppliers, and there is no need for specific procurement needs, and the procurement needs will be clarified before the second stage determines the transaction suppliers.

Correct answer: D

14. The following statement about electronic procurement is correct ( ).

A. Public bidding shall be carried out in electronic procurement.

B. Inquiries shall be made electronically procured.

C. Framework agreement procurement shall be carried out electronically.

D. The State encourages electronic procurement, but does not require any specific procurement method to be procured in electronic form.

Correct Answer: C

15. Regarding the agency fee collection of purchasing agencies, the following statement is correct ( ).

A. The method and standard of agency fee collection shall be determined by the procurement agency and shall be clearly stated in the procurement documents.

B. When the agency fee standard specified in the procurement documents is too low, the procurement agency may not issue the bid and transaction notice as a condition, and require the winning bid and transaction supplier to increase the fee appropriately.

C. In addition to the procurement agency fee, the procurement agency can also require the winning bidder and the supplier to reimburse the labor fee of the evaluation expert.

D. The purchaser shall agree on the method and standard of agency fee collection in the entrustment agency agreement, and the procurement agency shall collect agency fees in accordance with the agreement.

Correct answer: D

16. The Measures for the Management of Government Procurement Demand (Cai Ku [2021] No. 22) are applicable to the demand management of government procurement ( ) projects.

A. Goods, Works and Services

B. Goods and Services

C. Goods, services and projects that are not subject to bidding in accordance with the law

D. None of the above is true

Correct Answer: A

17. Supplier A is a shortlisted supplier of a closed framework agreement for office equipment, and due to the increase in market prices, the supplier has been disqualified from being shortlisted after accepting the contract order, and according to the framework agreement, Supplier A has been disqualified. Later, the office equipment framework agreement procurement project started the supplementary solicitation procedure according to the regulations, can supplier A participate in the supplementary solicitation activity?

A.Yes

B. Not allowed

C. As long as there is no prohibition in the supplementary solicitation announcement, you can participate

D. I can't tell

Correct Answer: B

18. The parties to a government procurement contract shall not modify, suspend or terminate the contract without authorization. If the continued performance of a government procurement contract will harm the national interest or the social public interest, both parties shall ( ) modify, suspend or terminate the contract. The party at fault shall be liable for compensation, and if both parties are at fault, each shall bear the corresponding responsibility.

A.Yes

B. Yes by consensus

C. Should

D. No

Correct Answer: C

19. In the process of handling government procurement complaints about a service project, the financial department of B involves the identification of small and medium-sized enterprises, and shall be responsible for the identification in accordance with the provisions of ( ).

A. The competent department of small and medium-sized enterprises of the people's government at or above the county level where the procurement project is implemented

B. The government procurement supervision and management department of the people's government at or above the county level where the procurement project is implemented

C. The competent department for small and medium-sized enterprises of the people's government at or above the county level where the service provider is registered

D. The government procurement supervision and management department of the people's government at or above the county level where the service provider is registered

Correct Answer: C

20. Suppliers who meet the requirements of small and medium-sized enterprises to participate in government procurement activities shall declare the type of enterprise in accordance with the standards for small and medium-sized enterprises approved by the State Council.

A. The industry to which the SME classification standard corresponding to the procurement subject determined in the procurement documents belongs

B. The industry to which you belong

C. The industry to which the main business belongs

D. Industries that are beneficial to themselves

Correct Answer: A

21. For those who meet the payment conditions agreed in the contract, the purchaser shall pay the funds to the supplier's account agreed in the contract within ( ) after receiving the invoice, and shall not delay payment on the grounds of organizational changes, personnel replacement, policy adjustments, etc., and shall not take the obligations not specified in the procurement documents and contracts as a condition for payment to the supplier.

A.15 days

B. 15 working days

C.30 days

D. 30 working days

Correct Answer: C

22. ( ) Have the main responsibility for the management of procurement requirements.

A. Purchaser

B. Purchasing Agency

C. Competent budget unit

D. Finance Sector

Correct Answer: A

23. In accordance with the circumstances prescribed by law, procurement may be made in accordance with competitive negotiation, and the following are not statutory circumstances that are used for competitive negotiation procurement.

A. After the bidding, there is no supplier bidding or there is no qualified bid, or the re-bidding is not established.

B. The technology is complex or special in nature, and the detailed specifications or specific requirements cannot be determined.

C. The total price cannot be calculated in advance.

D. It is special and can only be purchased from a limited range of suppliers.

Correct answer: D

24. Where a procurement agency maliciously colludes with supplier A to affect the winning bid or transaction results or may affect the winning bid or transaction results, the following handling methods are wrong ( ).

A. If the winning bidder and the supplier are not determined, the procurement activities shall be terminated.

B. If it has been determined that A has won the bid and the transaction has been completed but the procurement contract has not been performed, the contract shall be revoked and the procurement activities shall be terminated.

C. If it has been determined that A has won the bid and the transaction but the procurement contract has not been performed, the contract shall be revoked, and the winning bid and transaction supplier shall be determined from the qualified bid-winning and transactional candidates.

D. If the procurement contract has been performed and losses are caused to the purchaser and supplier, the responsible person shall be liable for compensation.

Correct Answer: B

25. The purchaser and the supplier who won the bid or the transaction shall sign the government procurement contract in accordance with the matters determined in the procurement documents within the date of issuance of the notice of winning the bid or the transaction.

A.10 days

B.20 days

C.30 days

D.40 days

Correct Answer: C

2. Multiple choice questions (15 questions in total, 30 points in total)

1. Procurement demand refers to the ( ) requirements that the purchaser intends to procure and the subject matter to be met in order to achieve the project goal.

A. Technology

B. Business

C. Laws

D. Policies

Correct answer: AB

2. In any of the following circumstances, the financial department shall give a warning and impose a fine of not less than 2,000 yuan but not more than 20,000 yuan; ( )

A. Failure to conduct independent review in accordance with the evaluation procedures, evaluation methods and evaluation standards specified in the procurement documents.

B. Disclosure of review documents and review information.

C. Accepting bribes or obtaining other improper benefits from purchasers, procurement agencies, or suppliers does not constitute a crime.

D. Leaving his or her duties without authorization during the review process, affecting the normal progress of the review process.

Correct answer: AB

3. The following statements about the discipline and legal liability of procurement work are correct ( ).

A. If the supplier uses improper means to slander or exclude other suppliers, the winning bid and transaction shall be invalid.

B. If the staff of the centralized procurement agency leaks the bottom of the bid before the bid is opened, and it does not constitute a crime, it may be fined, and if there are illegal gains, the illegal gains shall be confiscated.

C. After the notice of winning the bid or closing the contract is issued, if the purchaser violates the law and does not sign the procurement contract with the supplier who wins the bid or closes, it shall compensate the supplier for the loss, and the amount of compensation for the loss shall be equivalent to the loss caused by the breach of contract.

D. If the government procurement supervision and management department fails to deal with the supplier's complaint within the time limit, the directly responsible person in charge and other directly responsible personnel shall be given administrative sanctions.

Correct answer: ABCD

4. Which of the following conditions should be met by the complainant to file a complaint?

A. The complaint has been challenged in accordance with the law before the complaint is filed

B. The content of the complaint is in accordance with the regulations

C. File a complaint within the validity period of the complaint

D. The same complaint has not been handled by the financial department

Correct answer: ABCD

5. Regarding the samples in the bidding and bidding of government procurement goods and services, the following statements are correct ( ).

A. If the bidder is required to provide samples, the standards and requirements for sample production shall be clearly specified in the bidding documents.

B. The evaluation method and evaluation criteria of the sample shall be specified in the bidding documents.

C. After the end of the procurement activities, the purchaser can dispose of the samples provided by the unsuccessful bidder with its consent.

D. For the samples provided by the winning bidder, they shall be kept and sealed in accordance with the provisions of the bidding documents, and shall be used as a reference for performance acceptance.

Correct answer: ABCD

6. According to the "Measures for the Administration of Bidding and Bidding for Government Procurement of Goods and Services", if the bidder has one of the following circumstances, the bid is invalid. ( )

A. Failure to submit the bid bond in accordance with the provisions of the bidding documents.

B. does not have the qualification requirements specified in the bidding documents.

C. The quotation exceeds the maximum price specified in the bidding documents.

D. The tender documents contain additional conditions that are unacceptable to the purchaser.

Correct answer: ABCD

7. The content of the disclosure of government procurement intentions shall include ( ).

A. Name of the procurement project

B. Overview of procurement requirements

C. Budget amount

D. Estimated time of procurement

Correct answer: ABCD

8. With regard to the form of procurement under framework agreements, the following statement is correct ( ).

A. Framework agreement procurement includes closed framework agreement procurement and open framework agreement procurement.

B. Open framework agreement procurement should be the main form of framework agreement procurement.

C. Closed-ended framework agreement procurement should be the main form of framework agreement procurement.

D. There is no distinction between closed and open framework agreement procurement, and the solicitor can decide which form to use.

Correct answer: AC

9. If the complainant has any of the following acts, it is a false or malicious complaint, and the financial department shall include it in the list of bad behavior records, and prohibit him from participating in government procurement activities for 1 to 3 years. ( )

A. Fabrication of facts

B. Providing false information

C. Obtaining supporting materials by illegal means. Where there are obvious doubts about the legality of the source of evidence, and the complainant is unable to prove that the method of obtaining it was lawful, it is to be viewed as having obtained the evidentiary materials by illegal means

D. More than three complaints nationwide within 12 months have been found to be unsubstantiated

Correct answer: ABC

10. In any of the following circumstances, the financial department shall order the financial department to make corrections within a time limit, give a warning, and confiscate the illegal gains if there are illegal gains, and give sanctions to the directly responsible managers and other directly responsible personnel in accordance with law, and give a notification. ( )

A. The internal supervision and management system is not perfect, and the posts and personnel that should be divided and separated according to law are not separated or separated.

B. Entrust the centralized procurement project to other procurement agencies.

C. Accept the procurement entrustment of the purchaser for the decentralized procurement project.

D. Engage in profit-making activities.

Correct answer: ABD

11. In which of the following circumstances, suppliers of goods, projects or services may enjoy the support policies for small and medium-sized enterprises stipulated in the Administrative Measures for Promoting the Development of Small and Medium-sized Enterprises through Government Procurement. ( )

A. In the goods procurement project, all goods are manufactured by small and medium-sized enterprises.

B. In the project of procurement of goods, the suppliers involved in government procurement are small and medium-sized enterprises.

C. In the engineering procurement project, the construction unit of the project is a small and medium-sized enterprise.

D. In the engineering procurement project, the engineering design and construction unit is a small and medium-sized enterprise.

Correct answer: AC

12. Records of procurement activities shall include at least ( ).

A. Category and name of the procurement project

B. Procurement project budget, fund composition and contract price

C. Procurement methods, if procurement methods other than public bidding are adopted, the reasons shall be stated

D. Bid evaluation criteria and reasons for determining the winning bidder

Correct answer: ABCD

13. If the government procurement project is not tendered in accordance with the law, it shall be procured by means of ( ) procurement.

A. Competitive Negotiation

B. Inquiry

C. Single-source procurement

D. Competitive Consultations

Correct answer: ACD

14. With regard to the final offer for competitive negotiation (consultation), the following statements are correct ( ).

A. If the negotiation (consultation) document can specify in detail the technical and service requirements of the subject matter of the procurement, after the negotiation (consultation), the negotiation (consultation) team shall require all suppliers who continue to participate in the negotiation (consultation) to submit the final quotation within the specified time, and the supplier shall submit the final quotation shall not be less than 3.

B. The negotiation (consultation) document can not list in detail the technical and service requirements of the procurement object, and the final design plan or solution shall be provided by the supplier through negotiation (consultation), after the negotiation (consultation), the negotiation (consultation) team shall vote to recommend the design plan or solution of more than 3 suppliers in accordance with the principle of minority obeying the majority, and require it to submit the final quotation within the specified time.

C. The final offer is separate and is not part of the supplier's response file.

D. The final offer is an effective part of the supplier's response document.

Correct answer: ABD

15. Among the following statements related to government procurement projects, the correct one is ( ).

A. If the government procures the project and the goods and services related to the construction of the project, and the procurement is made by bidding, the "Bidding and Bidding Law of the People's Republic of China" and its implementing regulations shall apply.

B. "Project" as used in the Regulations for the Implementation of the Government Procurement Law refers to construction projects, including the new construction, reconstruction, and expansion of buildings and structures, as well as their related decoration, demolition, and repair.

C. The term "goods related to project construction" as used in the regulations for the implementation of the Government Procurement Law refers to the equipment, materials, etc., that constitute an integral part of the project and are necessary for the realization of the basic functions of the project.

D. The term "services related to project construction" as used in the regulations for the implementation of the Government Procurement Law refers to the survey, design, supervision and other services required for the completion of the project.

Correct answer: ABCD

3. True/False Questions (10 questions in total, 20 marks in total)

1. Before the deadline for bidding, the purchaser, the procurement agency and the relevant personnel shall not disclose to others the name and number of potential bidders who have obtained the bidding documents. ( )

A. Correct

B. Error

Correct Answer: A

2. In the bid evaluation, due to the absence, avoidance or health of the members of the bid evaluation committee, the composition of the bid evaluation committee does not meet the provisions of these measures, the purchaser or procurement agency shall continue to evaluate the bid after making up in accordance with the law. The bid evaluation opinions made by the replaced members of the bid evaluation committee are invalid. ( )

A. Correct

B. Error

Correct Answer: A

3. The text of the government procurement contract in the bidding documents of a furniture government procurement project stipulates: "After Party B delivers the goods and passes the acceptance of Party A, Party A shall pay the remaining contract payment, but retain 5% of the contract balance as a quality deposit." "This practice by the procurer is permitted by the laws and regulations governing government procurement. ( )

A. Correct

B. Error

Correct Answer: B

4. After the deadline for providing the bidding documents, because some suppliers have raised questions about the obtained bidding documents, the purchaser may convene the suppliers who have raised questions to hold a pre-bid Q&A meeting. ( )

A. Correct

B. Error

Correct Answer: B

5. Small and medium-sized enterprises participating in government procurement activities shall truthfully issue a "Declaration Letter for Small and Medium-sized Enterprises", and must not have a fluke mentality. If the winning bidder or the supplier enjoys the support policy for small and medium-sized enterprises, its "Declaration Letter for Small and Medium-sized Enterprises" will be made public and supervised in accordance with the law. If the content of the "SME Declaration Letter" provided by the supplier is untrue, it is a provision of false materials to win the bid, a transaction or a fraudulent bid to win the bid, and will be investigated for legal responsibility in accordance with the law. ( )

A. Correct

B. Error

Correct Answer: A

6. Procurement requirements can directly refer to relevant national standards, industry standards, local standards and other standards and specifications, and generally cannot put forward higher technical requirements. ( )

A. Correct

B. Error

Correct Answer: B

7. The purchaser may explain the project background and procurement requirements before the bid evaluation, and the content of the explanation shall not contain discriminatory or tendentious opinions, and shall not exceed the scope stated in the bidding documents. ( )

A. Correct

B. Error

Correct Answer: A

8. In the process of inquiry and procurement, if the purchaser and the procurement agency believe that the supplier's quotation is too high, they can negotiate with the supplier and ask it to reduce the price. ( )

A. Correct

B. Error

Correct Answer: B

9. Where government procurement bidding is pre-qualified, the pre-qualification documents shall be provided free of charge. ( )

A. Correct

B. Error

Correct Answer: A

10. The bid opening shall be presided over by the purchaser or procurement agency, and the bidders and members of the bid evaluation committee shall be invited to participate. ( )

A. Correct

B. Error

Correct Answer: B