laitimes

At 2 o'clock this afternoon, Rail Transit Line 18 opened!

author:Chongqing rail transit
At 2 o'clock this afternoon, Rail Transit Line 18 opened!

Lights, flowers, cameras in place

噔噔噔~

Let us applaud you

Rail Transit Line 18 debuts!

Yes, you read that right

It's two o'clock this afternoon

Rail Transit Line 18

It has officially opened for initial operation

🤗🤗🤗

At 2 o'clock this afternoon, Rail Transit Line 18 opened!

Chongqing has added another one

The backbone of rail transit connecting the north and south regions

Everyone's sense of travel experience

and a sense of well-being in life

will be significantly improved

At 2 o'clock this afternoon, Rail Transit Line 18 opened!

Rail Transit Line 18 has a total length of 29 kilometers and 19 stations, starting from Fuhua Road Station in Yuzhong District, passing through Xietaizi Station (temporarily suspended), Olympic Sports Center Station, Shipingqiao Station, Yangjiaping Station, Tanzikou Station, Huangjueping Station, Sichuan Fine Arts Institute Station, Power Plant Station, Lijiatuo Bridge Station, Chongqing University of Technology Station, Huaxi Industrial Park Station, Babin Road Wetland Park Station, Eggplant Creek Station, Baijusi Station, Funiuxi Station, Jinaoshan Station, Jumping Station, and ending at Jumping South Station in Dadukou District.

After the initial operation of Rail Transit Line 18, the first train departs at 6:30 and the last train departs at 23:00, with a minimum interval of 7 minutes.

At 2 o'clock this afternoon, Rail Transit Line 18 opened!

After the opening of Rail Transit Line 18, it can be transferred with the rail transit ring line, Line 2, Line 5, Line 9 and Jiang Jumper Line in the near future, and can be transferred with Line 24 and Line 26 in the long term, effectively serving the four administrative districts of Yuzhong, Jiulongpo, Banan and Dadukou, the two major business districts of Hualongqiao and Yangjiaping, and the two universities of Chongqing University of Technology and Sichuan Fine Arts Institute, realizing rapid interconnection between regions, driving the formation of industrial agglomeration along the line, and effectively improving the traffic situation in the central urban area.

At 2 o'clock this afternoon, Rail Transit Line 18 opened!

The completion and opening of Rail Transit Line 18 also marks the completion and commissioning of the first three phases of Chongqing's rail lines, and the number of Chongqing rail transit lines has increased to 13, with an operating mileage of 538 kilometers.

At 2 o'clock this afternoon, Rail Transit Line 18 opened!

Next, Chongqing will make every effort to promote the construction of the fourth phase of rail transit lines and accelerate the construction of a "twin-city economic circle on the track".

Treasures

What are you waiting for?

Hurry up and take this good news

Share it with your family and friends~

At 2 o'clock this afternoon, Rail Transit Line 18 opened!

1

2

3

Source: Chongqing Municipal Commission of Housing and Urban-Rural Development

Editor: Fan Run

校对:刘 畅责编:苏 阳终审:胡潆兮

At 2 o'clock this afternoon, Rail Transit Line 18 opened!

【Statement】In addition to the original content, the text and pictures of the rest of the manuscripts are from the Internet and major mainstream media. The copyright belongs to the original author. If you think the content is infringing, please contact us to delete it at 023-68002222.

Read on