laitimes

Nanling National Park (proposed) to carry out ecological and hydrogeological surveys

author:China News Network

Chinanews.com, Guangzhou, December 28 (Cheng Jingwei Lin Yin) The reporter learned from the Guangdong Provincial Forestry Bureau on the 28th that Nanling National Park (proposed) is carrying out ecological hydrogeological surveys, and has completed remote sensing interpretation, surface surveys and sampling and analysis during the wet season.

According to reports, the ecological hydrogeological survey of Nanling National Park (proposed) focuses on the central task of serving Nanling National Park, using remote sensing interpretation, surface investigation, drilling, sample collection, groundwater monitoring, database construction and computer mapping and other technical means to carry out the analysis of ecological-hydrological-geological multi-element system within 1931.57 square kilometers of Nanling National Park (proposed), and finally complete data collation, preparation of investigation reports and related results maps.

Nanling National Park (proposed) to carry out ecological and hydrogeological surveys

Staff are carrying out eco-hydrogeological surveys in the proposed Southridge National Park. Courtesy of Guangdong Forestry Bureau

"At present, we are carrying out sampling and analysis during the dry season, dynamic monitoring, and the construction of groundwater monitoring points. According to Li Donghong, a senior engineer of the Guangdong Provincial Geological Survey, the groundwater and surface water quality within the Nanling National Park (proposed) is good, and the test data of the wet season show that most of the water points are better than the Class III water standard (suitable for centralized drinking water surface water sources), and some spring water points also meet the standards of natural drinking mineral water, such as Tianjing Mountain Forest Farm, Luokeng Conservation Area and other places distributed in some spring metasilicic acid indicators to meet the mineral water standards.

Nanling National Park (proposed) to carry out ecological and hydrogeological surveys

Sampling analysis. Courtesy of Guangdong Forestry Bureau

It is understood that in order to monitor the dynamic changes of the groundwater environment, the survey also deployed the construction of two groundwater dynamic monitoring stations, and after the installation of monitoring instruments was completed in the later stage, it can be used for daily monitoring of the groundwater geological environment, and can also be used for water supply in case of emergency.

Nanling National Park (proposed) to carry out ecological and hydrogeological surveys

A geological landscape in the proposed Southridge National Park. Photo by Cheng Jingwei

The relevant person in charge of the Guangdong Provincial Forestry Bureau said that it will speed up the completion of the dry period survey of Nanling National Park (proposed), summarize and summarize the data obtained, complete the construction of groundwater monitoring points, strive for the early operation of monitoring instruments, promote comprehensive research and compilation of results, find out the hydrogeological conditions within the planning scope of Nanling National Park, excavate innovative achievements and put forward suggestions on resource management and community development in combination with the results, and develop geoscience science courses to serve the construction of national parks. (ENDS)

Read on