laitimes

A quick look at the highlights of December 21

author:Hualong Net

News Express

Line 15, Line 24, Line 27, Bitong Line The construction progress of many rail transit lines in Chongqing has been refreshed

On December 20, the reporter learned from Chongqing Communications Development Investment Group that the first phase of Chongqing Rail Transit Line 15 entered the track-laying construction stage, and the Antler Depot of Line 24 opened the curtain of the construction of the main structure project, and the construction of a number of rail transit lines ran out of "acceleration".

A quick look at the highlights of December 21

The first phase of the urban rail express line 15 has entered the track-laying construction stage. Photo courtesy of the interviewee

Urban Rail Express Line 15

The first phase entered the track-laying construction stage

Recently, the first section of the prefabricated track slab track bed between Liangjiang Avenue Station and Fusheng Station of the first phase of the urban rail express line 15 has been accurately positioned and the concrete pouring of the track bed has been prepared, marking that the first phase of the project of Line 15 has entered a new stage of track-laying construction. It is understood that the first phase of the urban rail express line 15 project has a total length of 103.724 kilometers, and the whole line is equipped with prefabricated track slab bed.

In addition, the underground excavation section of the turnaround line behind the T3 terminal station of the urban rail express line of Line 15 has also been successfully completed recently.

The T3 Terminal Station Switchback Line is an "important hub" for Line 15 (under construction) and Line 26 (under planning). According to the construction party China Railway First Bureau, the turnaround line behind the T3 terminal station is about 1 km long, the tunnel is relatively deep, and the tunnel entrance section is shallow.

It is understood that the first phase of Line 15 starts from Jiuquhe East Station and ends at Liangjiang Film and Television City Station, with a design speed of 140 kilometers per hour.

Metro Line 24

The right line of the shield section from Yinglong to the north station of the trade city is through

Recently, the right line of the shield section from Yinglong to Trade City North Station of Metro Line 24 has been successfully completed, marking that the project has achieved important phased results and laid a solid foundation for subsequent construction.

The pile foundation project of the antler depot of the first phase of the Metro Line 24 project was also officially launched, marking the beginning of the construction of the main structure of the project. The total length of the pile foundation of the main project is about 75,000 meters, and the construction period is about 5 months.

It is understood that the first phase of the project of Line 24 starts from Banan District and ends at Guangyangwan Station in Nan'an District, with a total length of 18.9 kilometers, and will form an interchange with the east extension of Line 6, Line 8 and Line 27 in the future.

Urban Rail Express Line 27

The second lining of the first mold of Ciqikou station was successfully poured

Ciqikou Station of Urban Rail Express Line 27 has successfully poured the second lining of the first mold of the underground excavation station of the whole line, marking that the construction of the project has entered a new stage.

Ciqikou Station is an important station of Line 27, located in Shapingba District, Chongqing, with busy traffic and large flow of people. The second lining of the first mold poured this time is an important part of the main structure of the Ciqikou underground excavation station, which will lay a solid foundation for the construction of Line 27.

Urban Rail Express Line 27, starting from Bishan and ending at Banan Huimin, has 15 stations along the way, including Bishan Station, Huxi Station, Ciqikou Station, Shapingba Station, Nanbin Road Station, and Chongqing East Railway Station (all stations are tentatively named), connecting Bishan, Shapingba, Chongqing East Railway Station and other areas.

Bi copper wire

Tongliang West Station is connected to the left line of Yunwushan Tunnel

A few days ago, the left line from Tongliang West Station of Bitong Line to Yunwushan Tunnel was successfully connected, which further improved the resource utilization rate between the two track-laying bases and provided favorable conditions for the smooth development of subsequent rail welding operations.

After the line is completed and opened to traffic, it will be transferred to Bishan Station with the opened Rail Transit Line 1, and the Line 27 that has started construction will be connected to operation.

"No closing" overnight Chongqing Jiangbei Airport upgraded overnight rest area

A quick look at the highlights of December 21

The free overnight rest area of Chongqing Jiangbei Airport was upgraded and put into use. Photo courtesy of Jiangbei Airport News Center

On December 20, a reporter from Hualong.com learned from Chongqing Jiangbei Airport that the free overnight rest area for passengers in the terminal of Chongqing Jiangbei International Airport was newly upgraded and put into use, which can provide a more comfortable rest environment for passengers to stay overnight.

On the west side of the 3J check-in island on the L4 departure floor of T3 terminal (open 24 hours a day), the entire rest area is wooden style, with screens and various green plants with on-site facilities and equipment, providing a more comfortable rest environment for passengers to stay overnight.

According to reports, there are supporting rest areas, luggage storage, toilets, mother and baby rooms, vending machines, water dispensers, infirmaries, electronic libraries, catering services (06:00-last flight interception time), mobile power supply, blanket borrowing and other supporting services, as well as electronic display screens and massage chairs, passengers can scan the seat QR code according to their needs to enjoy the massage + charging function, and at the same time "charge" the body and mobile phone.

Passengers can also go to the L2 arrival floor of Terminal 3, next to Gate 7 to experience the capsule sleep cabin, which is equipped with massage function sofas, digital TVs, charging sockets, fresh air systems, WiFi, etc. Blankets, mouthwash, face towels, and other items are also provided.

It should be reminded that the service time for mobile power bank and blanket borrowing is 04:30-23:00. If you are an eligible transit passenger, you can apply for a free hotel accommodation (one bed per person) located near the airport.

Details>>> "No closing" overnight Chongqing Jiangbei Airport upgrades overnight rest area - Network Reporter - Hualong Net

In 2024, these 81 public sports venues in Chongqing will be open to the public for free or at a low cost

The policy of free or low-cost opening of public sports venues is one of the important measures to build a higher level of public service system for national fitness. At the press conference on the theme of "Implementing the 20th National Congress of the Communist Party of China and Building a New Chongqing" (Sports and People's Livelihood) held on December 20, Du Xueyong, deputy director of the Chongqing Municipal Sports Bureau, introduced that the Municipal Sports Bureau has completed the application for free or low-cost opening subsidy funds for public sports venues in 2024, and plans to issue 29.36 million yuan of free or low-cost opening subsidies for public sports venues, and support 81 public sports venues in 33 districts and counties of the city to open to the public for free or at low fees.

In the next step, the Municipal Sports Bureau will strictly implement the opening requirements and promote the benefit of more citizens. Each venue is open no less than 35 hours a week and no less than 330 days a year. On public holidays, statutory holidays, school winter and summer vacations, etc., the opening hours shall not be less than 8 hours per day. The outdoor public areas and outdoor fitness equipment belonging to public sports venues are open free of charge throughout the year, and the opening hours are not less than 12 hours a day. Students, the elderly, the disabled, etc. are open to the public free of charge or at a low cost, and the annual "National Fitness Day" is open to the public free of charge.

A quick look at the highlights of December 21

In 2024, these 81 public sports venues in Chongqing will be open to the public for free or at a low cost- Network Reporter - Hualong Net.>>>

33 members of the China Aneng Chongqing Rescue Base arrived at the earthquake area and carried out rescue work in groups

A quick look at the highlights of December 21

China Aneng Chongqing Rescue Base carries out material transfer work. Photo courtesy of the interviewee

The earthquake disaster in Jishi Mountain in Linxia, Gansu Province touched everyone's hearts. On December 20, the reporter learned from the China Aneng Chongqing Rescue Base that 33 rescue team members who rushed to the earthquake area in Gansu had arrived in Jishishan County at 8 o'clock on the 20th to carry out rescue work.

At 23:59 on December 18, a 6.2-magnitude earthquake occurred in Jishishan County, Linxia Prefecture, Gansu Province (35.7 degrees north latitude, 102.79 degrees east longitude), with an epicenter depth of 10 kilometers, and the earthquake was strongly felt in Lanzhou and Dingxi.

At 14 o'clock on the 19th, after unified dispatch, China Aneng Chongqing Rescue Base selected 33 rescuers and 8 rescue equipment (sets) to rush to Linxia Prefecture, Gansu.

"After arriving at the destination in the morning, we received the task as soon as possible and invested manpower to transfer materials to the People's Government of Dahejia Town, Jishishan County. Zhu Zining, a member of the China Aneng Chongqing Rescue Base, told reporters.

Zhu Zining introduced that the team is an engineering rescue team with the main functions of pushing, digging and installation. The team includes life detectors, excavators, bulldozers, loaders and other heavy equipment operators.

Therefore, according to the characteristics of the team, China Aneng Chongqing Rescue Base also sent some personnel to carry heavy equipment such as life detectors, excavators, and bulldozers to Caotan Village, Zhongchuan Township, Haidong City, Qinghai Province, to carry out emergency rescue for the local sand surge caused by the earthquake.