laitimes

The Xinlong interchange section of the G0425 Guangao Expressway will be closed for construction

author:Yangcheng faction

The reporter learned from the traffic police detachment of the Zhongshan Municipal Public Security Bureau that due to the construction needs of the Nansha to Zhongshan Expressway project, the project manager department of the TJ06 contract section of the Nansha to Zhongshan Expressway of Zhongjiao Road and Bridge Construction Co., Ltd. will carry out temporary closure construction in both directions of the Xinlong interchange section of the main line of the G0425 Guangao Expressway (Guangzhou to Zhuhai).

The temporary closure of the above road section will be from December 20, 2023 to December 22, 2023, for a total of 3 days, and the control time will be from 22:00 to 6:00 the next day (8 hours) every day. In case of special circumstances such as bad weather, the control time will be postponed.

The traffic police reminded that in order to avoid the impact of the construction section on travel, please adjust the driving route in advance, and at the same time follow the road traffic signs, marking tips and information forecasts, pay attention to traffic safety, and obey the command of the traffic police, road administration and on-site personnel.

Among them, there are two detour schemes for vehicles from Guangzhou to Zhuhai (southbound) of G0425 Guangzhou-Macao Expressway. The first is to drive out of the →Sunshine Avenue→ National Highway G228 →Boai 7th Road→ Zhongshan City Urban Toll Station to → Zhuhai on Guangao Expressway, and the second is to turn right southbound to Zhongjiang Expressway → Port Toll Station and exit → Shenglong West Road → Port Toll Station to → Guangao Expressway Zhuhai.

The Xinlong interchange section of the G0425 Guangao Expressway will be closed for construction
The Xinlong interchange section of the G0425 Guangao Expressway will be closed for construction

G0425 Guangzhou-Macao Expressway Guangzhou to Zhuhai (southbound) vehicle bypass map

G0425 Guangzhou-Macao Expressway Zhuhai to Guangzhou direction (northbound) vehicles can also detour in two ways. The first is to drive out →of the toll station of Boai 7th Road→ National Highway G228→ Sunshine Avenue → the toll station of the people to the Guangao Expressway → Guangzhou→→→→→;

The Xinlong interchange section of the G0425 Guangao Expressway will be closed for construction
The Xinlong interchange section of the G0425 Guangao Expressway will be closed for construction

G0425 Guangzhou-Macao Expressway Zhuhai to Guangzhou (northbound) vehicle bypass map

Text丨Reporter Zhang Degang Correspondent Liu Hongxitu丨Provided by Zhongshan Traffic Police

Read on