laitimes

The resumption of service and the addition of trains are coming!

author:Prairie Railway

According to the travel needs of passengers

The grassland railway dynamically optimizes and adjusts the train operation plan

Some passenger trains will be added

Make every effort to increase passenger capacity

Additional trains

Z4184/1 time

Linhe to Shenzhen East

From November 16th to November 20th, Z4184/1 will be added every day between Linhe and Shenzhen East.

Z4182/3/2 times

Shenzhen east to Baotou

From November 18th to November 22nd, Z4182/3/2 will be opened every day between Shenzhen East and Baotou.

Z4281/4/1 times

Baotou to Hangzhou

From November 16th to November 20th, Z4281/4/1 will be added every day between Baotou and Hangzhou.

Z4282/3/2 times

Hangzhou to Baotou

From November 17th to November 21st, Z4282/3/2 will be opened every day between Hangzhou and Baotou.

The resumption of service and the addition of trains are coming!

Resumption of operation

Z6541 times

Baotou to Linhe

From November 16th to November 20th, Baotou to Linhe Z6541 resumed operation.

The resumption of service and the addition of trains are coming!

Tips

For specific details, please log on to the www.12306.cn website, if there is any change, please refer to the announcement of the day at the station. Passengers who take the train during peak passenger flow should reserve enough time to arrive at the station in advance, and cooperate with the staff to organize and enter the station safely and efficiently to get on the train.

Source: China Railway 12306

Photo: Liu Jinbo

Editor: Zhang Yuchen

Intern Editor: Lu Ziwei

Review: Zhang Libin

The resumption of service and the addition of trains are coming!