laitimes

It's time to secure the supply of coal

author:CCTD China Coal Market Network
It's time to secure the supply of coal
It's time to secure the supply of coal

At Hohhot South Station, a special coal train loaded with "Wujin" is ready to go

At present, it is a critical period of energy supply guarantee for the "peak winter", and Inner Mongolia, as an important national energy and strategic resource base, is effectively and orderly ensuring the safe and stable supply of coal to ensure that the people are warm in winter.

It's time to secure the supply of coal

National Energy Shendong Coal Group Bulianta Coal Mine fully mechanized mining face

In Ordos, in the Bulianta Coal Mine of Guoneng Shendong Coal Group, the equipment of the intelligent coal mining face roars and operates, and the belt conveyor continuously transports "Wujin" to the outside. The 13 mines and 11 coal preparation plants owned by Shendong Group are operating at full capacity. In Hulunbuir, the production dispatch center of Huaneng Yimin Coal and Power Company presents real-time data on coal production, transportation, storage, consumption and sales to ensure the stability of coal supply. As of November 10, Huaneng Yimin Coal and Power Company has produced 30.3 million tons of raw coal this year and completed 19.1 million tons of coal export... Coal production has been increasing rapidly, and coal production has been steadily increasing. According to the latest data, in the first three quarters of this year, industrial enterprises above designated size in the region produced 898 million tons of raw coal, ranking second in the country, accounting for 26.1% of the country's raw coal output, a year-on-year increase of 0.7%, driving the national raw coal output to increase by 0.2 percentage points, and the role of coal in energy security is fully highlighted.

Source: Inner Mongolia Daily

Editor: Xu Heyang

Click on "Star" to push in the front row

It's time to secure the supply of coal
It's time to secure the supply of coal