laitimes

This resettlement house can not get a property right certificate, where is the problem stuck? Department of Housing and Urban-Rural Development of Jiangsu Province: Completed within 10 days

author:Henan Business Daily

The balance has not been settled, the promise has not been fulfilled,

The resettlement house can not handle the property right certificate, where is the problem stuck?

Civil air defense projects built hundreds of compartments were ordered to be demolished,

How to pass the acceptance in the first place?

The new deal has been in place for nearly a year,

What is the situation of compulsory classification of domestic garbage in Nanjing?

On the morning of October 12, the "Political Style Hotline • I'll Help You Ask the Director" jointly sponsored by the Jiangsu Provincial Government Service Management Office and the Jiangsu Provincial Radio and Television Station welcomed Zhou Lan, director of the Department of Housing and Urban-Rural Development of Jiangsu Province, and Dai Yueqiang, director of the Jiangsu Provincial Civil Air Defense Office, as well as the relevant responsible persons of the Housing and Construction Bureau, the Urban Management Bureau and the Civil Air Defense Office of 13 districted cities, to respond to social concerns on the spot.

The resettlement housing can not get the property right certificate, but the housing and urban-rural development bureau "poor money"?

Yizheng citizen Mr. Zhou a few years ago due to the demolition of the old house, obtained 3 sets of houses in a local community, but for two years, the property rights certificates of these 3 houses have not been able to be processed, and the reporter found after on-site investigation that the reason behind it was related to the local housing and construction bureau.

Mr. Zhou's old house is located in Weidong New Village, Zhenzhou Town, Yizheng City, which belongs to a typical urban village. In 2017, the Qianjin Road area where the old house is located was listed as a shantytown renovation object. The housing expropriation department is the former Yizheng Municipal Housing Security and Real Estate Administration Bureau. Old house demolition, Mr. Zhou finally chose the compensation method of property rights exchange, in addition to the demolition of the old house of nearly 950,000, he made up 110,000 yuan, used to replace the purchase of three properties, "At that time, the Housing and Construction Bureau had a Fan Bureau responsible for expropriation to talk to me, saying that this side of the house expropriation, you make up 110,000 yuan, I will give you 3 properties, other things do not need me to ask." ”

This resettlement house can not get a property right certificate, where is the problem stuck? Department of Housing and Urban-Rural Development of Jiangsu Province: Completed within 10 days

In October 2019, Mr. Zhou got the keys to 3 houses in hongqi huayuan community from the Yizheng Municipal Housing and Construction Bureau. Hongqi Garden Community was built and developed by Yizheng City Urban Construction and Development Co., Ltd., and on October 10 of the same year, the company changed its name to Yizheng City Urban Development Investment Holding Group Co., Ltd. In January last year, Mr. Zhou transferred about 950,000 yuan of demolition money, together with his own 110,000 yuan, a total of about 1.06 million yuan, into the account of the real estate development company. After that, he planned to apply for a real estate property right certificate for the property, but he did not expect that Yizheng Chengfa Group refused to issue a house purchase invoice because the house payment had not been completed.

This resettlement house can not get a property right certificate, where is the problem stuck? Department of Housing and Urban-Rural Development of Jiangsu Province: Completed within 10 days

How much is the uncompleted purchase price? An official letter sent by the Yizheng Municipal Housing and Construction Bureau to the Chengfa Group shows that the total price of Mr. Zhou's three houses and garages is more than 1.23 million yuan, and at present, in addition to the approximately 1.06 million yuan paid by Mr. Zhou, there is still a balance of more than 170,000 yuan that has not been settled.

According to Yizheng City Investment Company, they also urged the Housing and Construction Bureau, but the balance was delayed. So, how did the balance of more than 170,000 yuan come about? Since the Housing and Urban-Rural Development Bureau has promised to settle the balance, why has it not been fulfilled? A staff member of the Yizheng Municipal Housing and Construction Bureau who handled the demolition and resettlement explained the original committee to reporters.

Yu Enfu The director of the Yizheng Municipal Housing and Construction Bureau's direct management of public housing management office at that time, when this household was demolished and resettled, two houses could be resettled, and the two houses had been taken care of, and his family had parents and several children up to 7 people, and later asked to take care of another house, which did not meet the conditions for resettlement. After the municipal shed reform headquarters coordinated and agreed to buy a set, the city investment company provided by the housing company about 75 square meters, the city investment company for takeaway, the price is a little higher than the price of the resettlement housing, the later generation of more than 170,000 yuan of difference costs, because at that time when individual leaders talked to us, it was said that this piece was then solved by the city shed reform command, or by the housing and construction bureau to solve.

Mr. Zhou said that since the beginning of last year, he has been running frequently for the purchase of invoices, but things have not made any progress. After the reporter intervened, the Yizheng Municipal Housing and Urban-Rural Development Bureau stated that the Housing and Urban-Rural Development Bureau will take action as soon as possible and strive to complete the matter within one month.

This resettlement house can not get a property right certificate, where is the problem stuck? Department of Housing and Urban-Rural Development of Jiangsu Province: Completed within 10 days

Tao Bolong, director of the Yangzhou Municipal Bureau of Housing and Urban-Rural Development: According to the regulations, the housing expropriation unit should meet the conditions for real estate certification when delivering the demolition and resettlement housing, that is, when the demolition and resettlement housing is delivered, the project completion acceptance should be completed, the project payment should be audited and paid, and all the payments should be paid. The household failed to handle the resettlement housing certificate in time because a staff member could not perform his duties due to special circumstances, and there was a contradiction in the settlement of the project payment. This issue will be coordinated as soon as possible, so that the people can get the property rights certificate as soon as possible.

This resettlement house can not get a property right certificate, where is the problem stuck? Department of Housing and Urban-Rural Development of Jiangsu Province: Completed within 10 days

Zhou Lan, director of the Department of Housing and Urban-Rural Development of Jiangsu Province: The difference of 170,000 yuan is mainly due to the third suite, which is caused by the market price difference between resettlement housing and commercial housing, and the Yizheng Municipal Housing and Construction Bureau issued an official letter to clarify that the government will help settle it. It cannot be affected by the internal reasons of the government to affect the property owners' certification, nor can it because of the adjustment of cadres and personnel, or even the individual personnel to affect the handling of normal work and affect the lives of the people. Yizheng Municipal Housing and Construction Bureau stated that it would resolve this matter within one month, and if there were no special disputes that should be completed within ten working days, the Provincial Housing and Construction Department would also follow up and supervise.

Nanjing Qing'ao Village: Why are there hundreds of compartments separated by civil air defense projects?

Article 49 of the "Civil Air Defense Law of the People's Republic of China" stipulates that in the event of any of the following acts, the competent civil air defense department of the people's government at or above the county level shall give a warning to the person concerned and order him to correct the illegal conduct within a time limit, and may also impose a fine of not more than 5,000 yuan on individuals and 10,000 to 50,000 yuan on units; if losses are caused, they shall compensate for losses in accordance with law:

(1) Encroaching on civil air defense projects;

(2) Failing to construct civil air defense projects in accordance with the protection standards and quality standards prescribed by the State;

(3) Violating relevant state regulations by altering the main structure of civil air defense projects, dismantling equipment and facilities of civil air defense projects, or using other methods to endanger the safety and effectiveness of civil air defense projects;

(4) Refusing to rebuild civil air defense projects after they have been dismantled;

(5) Occupying special frequencies for civil air defense communications, using the same sound signals as air defense alarms, or dismantling civil air defense communication or warning equipment and facilities without authorization;

(6) Obstructing the installation of civil air defense communications or warning facilities, or refusing to make corrections;

(7) Discharging wastewater, waste gas or dumping waste into civil air defense projects.

This resettlement house can not get a property right certificate, where is the problem stuck? Department of Housing and Urban-Rural Development of Jiangsu Province: Completed within 10 days

Some people have reported that the underground civil air defense project in the Qing'ao Village community in Nanjing has been separated by hundreds of compartments, which not only occupies the civil air defense project, but also affects the overall protection function of the civil air defense project. After the owner of the community complained to 12345, the civil air defense office of the jurisdiction issued a rectification notice to the construction unit and ordered the demolition within a time limit.

This resettlement house can not get a property right certificate, where is the problem stuck? Department of Housing and Urban-Rural Development of Jiangsu Province: Completed within 10 days

So is the rectification carried out as required?

This resettlement house can not get a property right certificate, where is the problem stuck? Department of Housing and Urban-Rural Development of Jiangsu Province: Completed within 10 days

Fu Yang, director of the Nanjing Municipal Civil Air Defense Office: The project was specially accepted for the quality of civil air defense projects in June 2014, and there was no storage compartment at the time of acceptance, which met the acceptance standards. After understanding with the construction unit, the storage room was temporarily built for the athletes during the Youth Olympic Games, and it was not demolished in time after it was built, and it was not contacted with the civil air defense department to report. At that time, it happened to involve the transfer of approval authority at the district level and the municipal level, and the Jianye District Civil Air Defense Office failed to request rectification in time after taking over.

This incident reflects two problems, one is that civil air defense projects are often not easy to find because they are underground; second, subjectively, local air defense departments should take the initiative to inspect and inspect. The next step is to strengthen the maintenance and management of civil air defense projects, especially in accordance with the models and requirements of "double random one open" and "Internet + supervision", strengthen the maintenance and inspection of civil air defense projects.

First, it is necessary to strictly implement the requirement of 100% annual inspection coverage of the district civil air defense, and if any violations are found in use, they should be investigated and dealt with in a timely manner. The Municipal Civil Air Defense Office should strengthen the guidance and supervision of the work in the district, conduct spot checks on this area, and the annual spot check ratio of the projects supervised by the district is not less than 20%.

Second, the province began to strengthen the work of marking last year, before it was only on the ground for the identification of human defense shelters, and now it is also marked in the basement of civil air defense, so that the general public can enhance their understanding and let the whole society supervise the work.

This resettlement house can not get a property right certificate, where is the problem stuck? Department of Housing and Urban-Rural Development of Jiangsu Province: Completed within 10 days

Dai Yueqiang, director of the Jiangsu Provincial Civil Air Defense Office: The Jiangsu Provincial Civil Air Defense Office should strengthen its work in this regard, because illegal construction is typical to a certain extent, and it will take more initiative to strengthen civil air defense supervision in future work. Civil air defense projects are built in three parts and seven in charge, and the supervision behind is very important, and maintenance is also very important. In order to win wars in wartime, pull them in times of disaster, and use them in peacetime, civil air defense in all localities should pay close attention to ensuring that daily supervision and supervision can be put in place.

Nanjing: What is the situation of mandatory classification of domestic garbage in the past year?

On November 1, 2020, Nanjing officially implemented the "Nanjing Municipal Domestic Waste Management Regulations", which requires the establishment and improvement of a full classification system for the classification, collection, transportation and disposal of domestic garbage, and Nanjing ushered in the era of "compulsory classification of domestic garbage". Nearly a year has passed, what is the situation of compulsory classification of domestic garbage in Nanjing?

This resettlement house can not get a property right certificate, where is the problem stuck? Department of Housing and Urban-Rural Development of Jiangsu Province: Completed within 10 days

Jin Nan, deputy director of the Nanjing Municipal Urban Management Bureau: The classification of garbage in old residential areas is a difficult point and a short board in The garbage classification work in Nanjing. Due to the small size of the area and the dense population, the old community brings great difficulties to the overall promotion of the work. The early stage of garbage classification is only popularized, but the key areas such as the old community are not paid enough attention, the work is not clear, the next step will be problem-oriented, and further promote garbage classification, especially the garbage classification of the old community.

The first is to continue to improve the construction of garbage classification collection points, reasonably increase the opening hours, and facilitate the citizens; the second is to implement responsibilities, clarify the service list, the list of responsibilities, and currently recruit hundreds of social garbage classification supervisors, enrich the team of garbage classification instructors, focusing on the work guidance and supervision of garbage classification in old residential areas; the third is to carry out cleaning actions, and at the collection points, we will improve the cleaning work of deodorizing mosquitoes and flies, improve the quality of garbage classification, and strive for more citizens to understand; the fourth is to increase supervision. Nanjing Urban Management has a 12319 hotline, which is receiving reports from citizens every day and soliciting opinions from everyone.

This resettlement house can not get a property right certificate, where is the problem stuck? Department of Housing and Urban-Rural Development of Jiangsu Province: Completed within 10 days

Chen Xi, director of the Urban Management Bureau of the Department of Housing and Urban-Rural Development of Jiangsu Province: At present, more than 20,000 communities in the province have implemented garbage classification, which basically achieves full coverage in the province. However, judging from the promotion situation in various places, there are still facility management in place reflected in the short film, including some problems such as noise disturbance, heavy odor, and untimely collection and transportation, which are caused by insufficient refined management, and are also the focus and direction of the next step.

First, strengthen work guidance. Recently, we are ready to jointly issue the "Implementation Opinions on Further Promoting the Classification of Urban and Rural Domestic Waste" with 12 provincial-level departments, and guide all localities to strengthen the management and construction of garbage classification facilities through the "Implementation Opinions", further improve the level of scientific management, fine management and long-term management of garbage classification, and promote the deepening and solidification of garbage classification in the province.

Second, promote construction with evaluation and promote reform with evaluation. Promote all localities to increase the intensity of facility maintenance through effectiveness evaluation, reasonably determine the time and frequency of collection and transportation, effectively do a good job in the connection of collection and transportation, and ensure that the garbage at the classified collection site is treated in a timely manner, and the surrounding is clean and tidy, so as to enhance the happiness and sense of gain of the general public.

Third, introduce third-party secret visits. Through secret visits, we have discovered some prominent problems and shortcomings in our work in a timely manner, and promoted rectification in various places in the form of notification and exposure, and continuously improved the quality and efficiency of garbage classification work.

Source: Jiangsu News Editor Lv Ruitian Liu Mengge