laitimes

Direct access to the big and small Meisha! This subway line is striving to open this year!

author:Shenzhen Special Zone Daily

Every weekend and holidays

Shenzhen ER will want to have a game

Romantic big and small Meisha sea view tour

The fairy has also always wanted to go

Just dissuaded by one thing

↓↓↓

Because before seeing the sea

You may want to be on the highway first

Enjoy a car show

fortunately

This one goes straight to the big and small Meisha

✨Line 8 Phase ✨ II

The latest developments have arrived

The desire to go to see the sea without being stuck in traffic

It's finally coming true!

Direct access to the big and small Meisha! This subway line is striving to open this year!

Line 8 Phase II

The three work areas and rail areas have all been handed over

Recently, the second phase of Metro Line 8 successfully passed the acceptance of the sub-unit project, which also marked the completion of the handover of the rail travel area of the third work area, laying a solid foundation for the opening and operation of the whole line.

Direct access to the big and small Meisha! This subway line is striving to open this year!

The acceptance team inspected the engineering entity, appearance quality, standard construction, internal industry data, etc. in detail, and unanimously agreed that——

and the quality, safety and function of the sub-unit engineering entity meet the design and specification requirements, the construction data and quality control data are true, complete and effective, the random inspection results of the main functional items meet the provisions of the professional quality acceptance standards, the comprehensive assessment is qualified, and the acceptance is agreed.

Direct access to the big and small Meisha! This subway line is striving to open this year!

Direct access to the big and small Meisha

There are 4 stations in total

The second phase of Metro Line 8 starts from the end of Yantian Road Station, the terminus of Line 8, and extends east to Xiaomeisha, with a total length of about 8 kilometers. The whole line is laid underground, including four stations and four sections, all in Yantian District

There are 4 stations on the line, which are-

  • Kitayama Road Station
  • Yantian Food Street Station
  • Dameisha Station
  • Xiaomeisha Station
Direct access to the big and small Meisha! This subway line is striving to open this year!

▲Schematic map of the second phase of Line 8 (subject to actual completion)

Direct access to the big and small Meisha! This subway line is striving to open this year!

Line 8 Phase II

Strive for today! Year! Open! Open!

As an important traffic artery of Shenzhen's "eastward strategy"

After the completion of the second phase of Line 8

It will be connected to Metro Line 2

When the time comes

Everyone can take the subway directly

Go to the eastern seaside waves

Still stunned for what

Share, retweet, comment up hey~

# Which subway line are you most looking forward to opening? #

Source|Shenzhen Communications, CCCC Shenzhen Engineering Bureau