laitimes

The picture says that | busy with the construction of key projects

author:Fast news
The picture says that | busy with the construction of key projects
The picture says that | busy with the construction of key projects
The picture says that | busy with the construction of key projects

On April 20, workers were stepping up construction at the construction site of the Suzhou Street project.

The picture says that | busy with the construction of key projects
The picture says that | busy with the construction of key projects

It is understood that Suzhou Street is located in Susu Industrial Park, which is a commercial characteristic block along the river according to the overall planning layout of the park, covering an area of 41,000 square meters and a total construction area of 53,000 square meters, which will become a new carrier for the cultural integration of Suzhou and Suqian, and a new benchmark for Suqian characteristic business. (Photo by chen shaoshuai, a quick news reporter)

The picture says that | busy with the construction of key projects