China Shandong Network - Perception Of Shandong October 8, recently, the "Ziyang Fault Exploration and Surface Deformation Observation Project" undertaken by the Provincial Lunan Geological Engineering Exploration Institute was successfully started, and Fan Provincial, chief of the Geological Survey Section of Jining Natural Resources and Planning Bureau, came to the scene for inspection and guidance.
The project is a geological survey project funded by Jining City, the purpose of which is to find out the characteristics of the Ziyang fault in the survey area, to monitor the surface displacement settlement that it may cause for a long time, and to provide monitoring data for the safe operation of the nearby high-speed railway. The Municipal Bureau attaches great importance to the geological safety and security of major infrastructure and gives strong support to the implementation of the project.
Fan Province inspected the on-site construction environment and geophysical exploration equipment, listened carefully to the project team's report on the two-dimensional seismic exploration work plan, believed that the project construction method was reliable, the schedule arrangement was reasonable, and the safeguard measures were complete, emphasizing the need to ensure that the project quality and progress control measures were in place, ensure the quality of geophysical surveying and the accuracy of translation, and provide scientific and accurate data basis for the subsequent monitoring point site selection.
The representative of the project supervisor and the project team of Lunan Hospital accompanied the inspection. (Zhang Wei, Yang Qi)