1. The site is clean, the slag is bagged and stacked centrally; 2. The materials are neatly stacked according to the regulations; 3. The site is equipped with fire extinguishers; 4. There are temporary distribution boxes on the site and comply with the company's regulations; 5. The ground
author:Chengdu U home workshop home decoration
1. The site is clean, and the slag is bagged and stacked centrally;
2. The materials are placed neatly according to the prescribed code;
3. Fire extinguishers are equipped on site;
4. There is a temporary distribution box on site and in line with the company's regulations;
5. The floor drain and the sewer nozzle are protected by a protective cover;
6. The gas meter has been covered with a protective cover;
7. The wall and ground are uniformly coated, no leakage brush, the top surface of the wall is yellow, and the ground is green;
Before the start of construction, all the projects of the safe and civilized construction inspection have been qualified.