SAP WM Elementary IM Level Goods Automatically Completes TO Creation and Confirmation after WM Level Cargo Movement
Sap systems do a great job of automation.
Since the SAP WM module is enabled, the management inventory to the shelf level makes the inventory management of the enterprise more accurate and detailed, but it also inevitably increases the manual operation of the business personnel on the system.
In fact, the SAP system can automatically complete the movement of goods at the WM level in some scenarios through the configuration of the background, that is to say, after the business personnel complete the movement of goods at the IM level, the system automatically completes the creation/confirmation of documents such as TR/PCN/TO at the WM level.
Of course, the premise is that we have defined the WM level of the shelf removal strategy, so that the SAP system can automatically find the shelves in the shelf or the removal scenario.
Here is an example of a scenario where the shipment is delivered to a cost center.
1, The main background configuration
WM plane mobile type 201 configuration,
![](https://img.laitimes.com/img/__Qf2AjLwojIjJCLyojI0JCLiMGc902byZ2P0gzM4ITN1ETZjlTY5IDOhVGOxQDNlVWO3IWNkN2MkBzLcBza5QTcsJja2FXLp1ibj1ycvR3Lc5Wanlmcv9CXt92YucWbp9WYpRXdvRnLzA3Lc9CX6MHc0RHaiojIsJye.jpg)
The removal strategy for storage type 002 under warehouse number NM1 is F,
2, Front desk function display.
Execute the transaction code MIGO, do a move type of goods move for 201,
Enter the material number, quantity, factory, storage place,
Enter the cost center and post it.
Then check the generated item voucher number,
TR Number 12
TO number 14.
It can be seen that this TO order is automatically created and automatically confirmed.
Note: The above demonstration is based on sap S4/HANA 1909 systems.
-Ends-
Written on Feb. 18, 2022.