On January 26, the annual "Ping An Star" event sponsored by China Chang'an Network and The Central Political and Legal Affairs Commission An Jian came to an end, and the annual "Ping An Star" list of 300 people was officially announced, and Zhang Yongchao, an employee of the public development group affiliated to the Provincial Bus Construction Group, was honorably listed.
A total of 17 Ping An China Construction Coordination Group member units and 32 provincial Ping An Construction Leading Group Offices participated in the selection, 70 million netizens enthusiastically voted, the total number of votes reached 221 million, Zhang Yongchao and other comrades stood out from 1500 monthly "Ping An Star" and won the title of "Ping An Star" of the year, is one of the 10 awardees in our province, and is also the only person in the state-owned assets system and transportation industry in our province.

Zhang Yongchao, a member of the Communist Party of China, an engineer, a first-class construction engineer and a supervision engineer, is currently the director of the Conservation Department of Longnan Nantongtu Company of Gongfa Group. In recent years, he has concurrently served as the project manager of Longnan Dangerous Bridge Reinforcement, Security Engineering, Water Damage Rescue and other projects, responsible for the reinforcement and transformation of more than 30 dangerous old bridges, the security of many national and provincial trunk lines, the upgrading of tunnel quality, the improvement of bridge protection capabilities and other projects, and is responsible for the maintenance and management of expressways. He has published 2 papers and 1 utility model patent. He has been rated as "Youth Post Expert" of Bus Construction Group, "Youth Post Pacesetter", "Advanced Worker" and "Excellent Communist Party Member" of Gongfa Group.
In his work, Zhang Yongchao has always been rigorous and meticulous in his work style, leading the technical personnel in the work area to conduct drag-net investigations of bridges, culverts, roadbeds and pavements under domestic management on foot, collecting and checking the basic information and technical data of the bridges, and timely assessing the various parts of the bridge to provide guarantees for the safe operation of the bridge; with the spirit of solid and hard work, adhere to the principle of "moving down the pass and sinking the team" to implement the safety responsibility to the last kilometer, and the last step is to lead the maintenance work areas, organize the establishment of professional maintenance teams, and grasp the key points In the daily work, we aim at the emerging and root cause problems, eliminate the hidden dangers of the problem in the bud, further improve the quality of road safety, and ensure the safety of the drivers and passengers; with the concept of dedication that dares to take responsibility, we have successively participated in the 2018 S206 line "7.10" water damage rescue and the 2020 "8.12" water damage rescue task, grabbed the high-speed lifeline for the first time, and effectively guaranteed the safety of the people's lives and property.