The subway is the main artery of the city, which has a great help to the expansion and quality of the city, and with the passage of time, the attention of the Ningbo Rail Transit Line 5 market, which is expected to open in December, is heating up, and the expectations of netizens for TA are getting higher and higher.
First of all, let's briefly review, Line 5 is the only line in Ningbo that connects end to end to form a closed loop, and there are 22 stations in the first phase of the project.
It starts from Buzheng Station in Haishu District in the west, passes through Haishu District, Yinzhou District, Ningbo National High-tech Zone, Zhenhai District, and ends at Xingzhuang Road Station in Zhenhai District, with a total length of about 27.9 kilometers, and reserves the conditions for extending the ring for the second phase.
Line 5 is set up as an underground station, and there are as many as 10 interchange lines alone, so many interchange stations will greatly improve the overall commuting efficiency of the city.
Line 5 interchange station indication, real estate new observation system
Looking at the whole city, the line not only directly connects the two major centers of Ningbo East New Town and Yinzhou Central District. It is also to open up the lower parts from the west of the city to Gulin, the north of the city to Zhuangshi and the south of the city, and after completion, it will become the "one ring" in the future Ningbo rail transit "one ring, two fast and seven shots".
It can be said that after the completion of Line 5, it will further enhance the density of the urban subway network, more comprehensively support the needs of urban functional development, and the comprehensive bearing capacity of the city.
It is reported that the Line 5 train is the first fully automatic train in the province.
The train is equipped with the goa4 operation mode with the highest level of automation in the world, which not only automatically realizes functions such as wake-up, self-test, and departure, but also automatically adjusts the brightness of the passenger room lighting in the carriage, and saves about 20% more energy than conventional trains in terms of power consumption.
Not only that, but the new comfortable seats have been adopted in the car room, and the overall comfort has been significantly improved with the addition of an open driver's room. It can be said that Line 5 should be the most comfortable train in Ningbo, but it is also the most complex train in terms of line and equipment.
From a public gallery
The second phase of Line 5 project as early as the "Ningbo Urban Rail Transit Recent Construction Plan (2020-2025) Environmental Impact Report (Draft for Comments)": the total length of the line is 16.8km, with 13 stations and 6 interchange stations. The lines intersect with Waicaocun Station of Line 3, Kangzhuang South Road Station of Line 7, Lugang Station of Line 1, Hongda Road of Line 8, and Wangtong Road Station of Line 6.
Although various versions of the Line 5 route map have been transmitted online, the specific route plans of other stations are still under study, but they have not received an official hammer. Therefore, Xiaobian made a rough connection prediction on the 5 interchange stations currently known, and the line is expected to be connected to Haishu West, Yaojiang New Town, Cicheng New Town and Zhenhai New Town.
The high-speed construction of rail transit, as well as the continuous expansion and extension of the line, has always enriched the traffic and economic vein.
Today, Xiaobian will start from Xingzhuang Road Station to list for you the projects near the first phase of the Ningbo Metro Line 5 project, with a straight-line distance of less than 1500 meters and plots that have not entered the market, for the reference of netizens who have the intention of buying a house.
Sanguantang Station (Line 2 Transfer)
Vanke Rail Crossing Binhongli
▲Project renderings
Project Address: Intersection of Minghai Avenue and Fenghua Road in Jiangbei District
Building area: about 33,000 square meters, total number of households: 155 households, decoration: with decoration
Floor plan: The building area is about 100-125 square meters of high-rise
Commercial facilities: comes with 4100㎡ commercial
The average price of residential filing: about 26,000 yuan / ㎡
Longguang Jiuning Province
Project Address: Zhuangshi Street, Zhenhai District, north of Zhuangshi Avenue, east of Zhuangshi Street River
Building area: about 27,000 square meters, total number of households: 252 households, decoration: with decoration
Apartment type introduction: about 96-126 ㎡ small high-rise, high-rise, parking space limit of 200,000 / piece
Living facilities: Zhuangshi Park, Ningbo Xinmin Hospital, Ningbo Kangning Hospital
The average price of residential filing: about 26500 yuan / ㎡
Academician Road Station (Line 6 Transfer)
Vanke Mushi
Project Address: Yinzhou Qingshuiqiao Road and Kexing Road intersection
Building area: about 114,000 square meters, plot ratio: 2.0, total number of households: 667 households, decoration: full decoration
Apartment type introduction: 128-245 ㎡ small high-rise, high-rise
Commercial facilities: Ganglong Times Square
Rough billet limit price: high-rise 32100 yuan / ㎡, small high-rise 34600 yuan / ㎡
Liuai Station (transfer S4/K2)
Dongtou Eastern New Town commercial and residential plots
▲Schematic diagram of the plot
Plot address: the core area of the eastern new city, south of Baizhang Road, north of Qingze Street, east of Shubo Road, west of the planning branch road, the land transfer area is 15909 square meters, and the plot ratio is 1.3-4.5. The plot is located in the water town neighborhood plate of the core area of the eastern new city, which can be called the "pearl" of the eastern new city, and the surrounding supporting facilities are very mature in the future, which will be composed of a 120-meter-high commercial office building and a super high-rise apartment-style residence with 70 years of property rights.
The average sales price of commercial residential rough blanks is not higher than 38,000 yuan / ㎡, the maximum sales unit price of commercial residential rough blanks is not higher than 41,800 yuan / ㎡, and the sales price of parking spaces is not higher than 300,000 yuan / pcs
Xiaying Road Station
Cres Yulan Song
Project Address: Line 4 Jinda South Road Station Subway Cover
Building area: about 122,000 square meters, total number of households: 472 households, decoration: with decoration
Apartment type: High-rise building area of about 105-119 square meters
Commercial facilities: Perocheng Commercial Plaza, 128 Commercial Plaza, etc
Reference average price: about 30271 yuan / ㎡ (including basic decoration package)
New Hope · Dongqian Lake Group under the lot
It belongs to Xiaying Subdistrict, northeast to Shounan East Road, southeast to Shengqiao Road, southwest to Zongde Road, and northwest to Yingci Road. The transfer area is 13,896 square meters, the plot ratio is 2.2, the total construction area is 31,000 square meters, and it is planned for urban residential and supporting land, and the residential height limit is 27-54 meters.
The average sales price of commercial residential rough blanks in the plot is not higher than 31,300 yuan / square meter, and the maximum sales unit price of commercial residential rough blanks is not higher than 35,995 yuan / square meter; the maximum sales price of parking spaces is not higher than 250,000 yuan / piece. The residential building of the plot implements full decoration of the existing house sales, the decoration standard is 2000-3000 yuan / ㎡.
According to the 3000 yuan / ㎡ installation bid to calculate, the average sales price of the plot should be about 34300 yuan / ㎡, and it is expected to enter the market in 2023.