laitimes

Yangtze River Commission Hydrological Upstream Bureau: Smell the "flood" and move to meet the biggest flood of the Yangtze River this year

author:Bright Net

Chongqing, September 7 (Xinhua) -- At 8 o'clock on September 6, the "Jialing River Flood No. 2 of 2021" was formed in qujiang; at 14:00 on the 6th, the "Yangtze River Flood No. 1 of 2021" formed in the upper reaches of the Yangtze River... In the face of the largest flood of the Yangtze River since it entered the flood this year, the Hydrological Upstream Bureau of the Yangtze River Water Conservancy Commission has heard the "flood" and moved, done a good job in hydrological forecasting and monitoring, and provided reliable technical support for the safety of flooding.

Yangtze River Commission Hydrological Upstream Bureau: Smell the "flood" and move to meet the biggest flood of the Yangtze River this year

The picture shows that on September 6, the Jialing River Beibei Hydrological Station under the Hydrological Upstream Bureau carried out high flood monitoring. (Photo by Wang Jian)

The Yangtze and Jialing rivers have experienced numbered floods at the same time, which is the largest flood situation in the upper reaches of the Yangtze River since the floods began this year. The Hydrological Upstream Bureau responded quickly, strengthened the duty duty, and maintained the "combat" state of flood prevention and reporting for 24 hours. Conscientiously implement the technical requirements of Gaohong monitoring and reporting, the staff also combined with the "one station, one policy" program, scientifically arranged the measurement, adopted scientific and reasonable methods to do a good job in the collection of Gaohong data, and seized the opportunity to carry out the work of comparing and analyzing new instruments and new technologies.

Zhang Shiming, secretary of the party committee and director of the Bureau of Hydrology and Upstream, said that as of the evening of the 6th, the water from the Minjiang River and the Tuojiang River had all turned back to the present peak, and the water from the Jialing River Beibei and the Yangtze River Main Stream Inch Beach Station was also about to peak. "We are paying close attention to the rainfall of the rivers in the basin and the scheduling of water conservancy projects, carrying out hydrological forecasts on a rolling basis, and releasing forecast results in a timely manner to provide guarantees for stable flooding." Zhang Shiming said.

Source: Xinhua News Agency