1. Preparations

2. Galaxy construction

3. Dyson sphere construction

Attachments: "Supermarket Blueprint", "Construction Track Record"

1. Preparations

1. Time preparation, it takes 60-70 hours to build, 10 hours to hang up and wait for the formation of Dyson balls;

2. Game ideas, function positioning settings:

1) Functional positioning of the home star

* Research Institute (Arctic-Climb Technology Function)

* Supermarket (Antarctica - Building Pick-up Office Function)

* Space Warper (Production Base)

* Dark matter energy bar (production base)

2) Functional positioning of Dyson Sphere 1 star

* Dark Matter Supply (North and South Pole Receiver +57° Railgun)

* Solar sail production base

* Small rocket production base

3) Thoughts on the Dyson sphere N-star

* Game benefit time

* Use your imagination to make a variety of patterns for Dyson balls

3. Tool preparation:

1) Print out a blueprint for the construction of the supermarket (Figure 1).

2) Make a document "Construction Record" and "Resource Set" to record the construction trajectory (Figure 2).

3) Open the website of the Dyson Sphere Mass Production Calculator tool "https://www.svlik.com/t/dsq/" (Figure 3)

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

Second, the construction of the galaxy, that is, the construction of the home star as the core, to solve the problems of supermarkets, climbing technology, and the production of warpers.

1. Choose a planet, a good start is half the battle.

1) 1 times the amount of normal resources

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

2) Choose one with combustible ice, which can simplify the production of graphene in the future and greatly improve efficiency. Remember

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

3) Open a few more rounds so you can find it.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

2. Blue and brown sugar stages. There are 2 stage goals:

* Crawl technology

* Build a supermarket

1) The location of the supermarket, near the pole, has the advantage that it is easy to find in the future, and the high-quality land at low latitudes is reserved for production and construction.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

2) The blue sugar production area is as close as possible to the vicinity of another pole, and the production and construction of the blue sugar production area are very simple. In this process, attention should be paid to the automation of "conveyor belts" and "claws" to create conditions for the establishment of (supermarkets).

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

3) Build a supermarket, don't be creative, and build a supermarket in strict accordance with the blueprint. [The time period to unlock brown sugar is just enough to build a supermarket in the first row]

It takes more energy and time to build a supermarket in the early stage, but it must be done, once the supermarket is built, it is like a martial arts master who has opened up the second pulse of Ren Du. (PS: The conveyor belt of the supermarket does not need to be upgraded, the supermarket is formed early, and the items are filled early). It's like the Celestial Empire tightened its belt during the Taizu period to establish the most complete industrial category on the Blue Star, and there are conditions for opening up in the future.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

Tips:

A "electric energy station" conveyor belt circulation layout, in the future, can be expanded to the surrounding area to form an electric energy support area. When the resources are exhausted, directly replace the mining area with the interstellar logistics tower, such an electric power station can support you to the small sun. Give up the idea of using coal as the main power supply, instability is its flaw, excessive power supply, 1-2 pieces are enough.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

B The raw material area and processing of the supermarket are independent of each other, and the open space is reserved, and the various materials provided by the supermarket are the key conditions for you to save time and simplify the difficulty.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

C Brown sugar, brown sugar and other sugar production areas are independent production areas, independent supply, independent production. And refuse to crowd, leaving plenty of room for future expansions. In particular, it is reminded that the production of solar panels should be given priority, and a few more storage boxes should be placed, which will be of great use later.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

D. X-ray cracking is studied immediately after the brown sugar is unlocked, which can simplify the difficulty of hydrogen production and improve the efficiency. With a strategy in hand, this is how you can predict the future direction of technology.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

E. Hydrogen production X-ray pyrolysis product of brown sugar - graphite, burned off. This thing is and will be very clogged, so don't be reluctant to do it.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

3. Brown sugar stage, this stage you will fly out of the home planet, this stage is very critical, it is the watershed between the master and the rookie, there are 4 tasks in this stage:

* Crawling technology;

* Hand rubbing the interstellar logistics tower (to solve the problem of lack of titanium in the home planet);

* Processing star construction (to solve the problem of silicon deficiency in the home star);

* Put on the gaseous collector (to solve the graphene demand of the home planet);

1) Hand-rubbing interstellar logistics tower: understand and realize the task to solve the problem of titanium deficiency in the home planet.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

2) Processing star construction: processor production area to solve the problem of silicon deficiency in the mother star.

2.1) The processor is first built at 120 pcs/min to understand and implement the task. (In the future, the peak demand for processors will be 600 units/minute, so the planning production area should reserve space for expansion.) The 2-chip processor production area is enough to support you to play until the end)

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

2.2) The green motor production area is planned in the early stage of 120 pieces/min, understand and realize the task. (The peak period in the future is about 500 / minute, such a production area, 2 green motor production areas can support you to play to the end). Note that the main points are the same as the processor. (Ibid.)

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

3) Construction of home star supermarket. It is necessary to spend time to improve the supermarket, and the focus at this stage is to build the automation of "orbital collectors", which is very important for the mining of combustible ice to produce graphite at this stage and the establishment of 2-3 gaseous stars to supply "hydrogen" + "heavy hydrogen" in the future.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

skill

A The maximum charging power of the logistics tower is adjusted to the minimum to save electricity, and the resource logistics tower does not need to be electrified, and the internal elevator also works, which does not affect the docking of the spacecraft, and can automatically send and receive goods.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

B Near the pole, set the place of synthesis of sugar, the place of study. The space arrangement is the most reasonable and easy to find.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

C Fly out of any planet, immediately adjust the angle to vertical, and need to reach an escape velocity of more than 220 to break away from the planet's gravity. (After getting out of gravity, you can aim at the target planet you want to go to, otherwise you can't aim accurately)

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

D Even if you have a maximum speed of 2000, you can land directly by aiming at the center point of the planet. This mecha is very resistant to beating, and it will not smash the planet into a hole or anything, let alone explode on the spot, and sometimes there will even be a spectacle of directly hitting the bottom of the sea and diving.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

E processing star, in the early stage, wind energy, solar energy equator to walk around, enough to support the demand for electric energy. It's no problem to support 3-4 industrial zones. In the later period, in the middle of the era of Dyson sphere construction, if you need to build a processing star, you can go directly to the small sun.

This is a complementary pair, wind energy has the disadvantage of taking up space, and solar panels have the disadvantage of having a short connection distance and must circle the planet otherwise the electrical energy is unstable, and the advantages and disadvantages of the two complement each other.

(If you use fossil energy, the moment when the resources are exhausted is the moment when you go all over the universe to investigate the problem and fly thousands of miles to solve the problem)

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

F parent star (including future solar sail and small rocket production star) resourcesIn order to avoid the future starship flying randomly, the local products are set to "interstellar storage".

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

In G map mode, you can grab the resources in the logistics tower, which is very convenient.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

Don't waste H hydrogen, it takes 12 hydrogen to make a "Casimir chip" when it is green sugar, and the "Casimir chip" is also needed in the mass production area of a small rocket, and when the time comes, you will have to go to the universe to find a gaseous planet to establish a supply chain. It's an element that people love and hate.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

Hydrogen, in addition to production and consumption in the early stage, is only used as a "hydrogen fuel rod" to fuel the mecha, which is much better than graphite, and can be directly burned with this until the "antimatter rod" is produced.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

I The logistics tower has the function of automatic sorting of shared conveyor belts, but do not do this, there is no suspense that it will definitely form a blockage.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

4. In the stage of purple and green sugar, the complexity of sugar synthesis at this stage has increased significantly, and the construction body with clear ideas will show strong power. There are 3 tasks in this stage:

* Crawling technology;

* Circumstance;

* Establish a supply chain for scarce resources;

1) Processing the processor produced by the star, starting with the combustible ice (graphene) produced by the gas planet, making the output of purple sugar as simple as a joke.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

1) Out of the warper

The aim is to establish a supply chain of rare resources to streamline production. "Organic crystals, grating stones, single-grade magnets, hydrogen gaseous stars, sulfate seas" are all high-value targets, among which the priority is to establish an "organic crystal" supply chain, which is important for green sugar. In addition, my version of the silicon mine is insufficient, and I also need to establish a silicon board supply chain.

With a goal of 60 pcs/min, understand and implement the task:

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

With the warp in hand, you're about to embark on an interstellar journey with an irresistible excitement. But don't worry, at this time you need to open the toolbox and take out the small ledger:

A. Improve the "Construction Track Record" and organize the construction ideas to avoid finding problems in the future;

B Check the target resources of each galaxy and record them in the Resource Set. Once again, it is a special reminder to prioritize the establishment of a supply chain for organic crystals to liberate themselves from the complex titanosmine synthesis (brown sugar, green sugar need this thing).

3) According to the planning of the small ledger, the construction of resource stars, the construction of rare materials supply chain.

4) At this time, you will encounter a monster that eats hydrogen: Casimir Crystals. One crystal eats 12 hydrogen elements, and the previously stored hydrogen elements begin to play an excessive role at this time, and the future supply of hydrogen elements will be solved on 2-3 gaseous stars (and the future heavy hydrogen demand can also be partially solved).

Refer to the screenshot for the specific layout skills (otherwise the hydrogen consumption is too fast, and the high-speed conveyor belt will not be available)

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

skill

A Rapid collection of sand: For buildings with a large area such as chemical plants (power stations), a large amount of sand can be quickly collected by construction and demolition. When you see a planet with a high altitude, you will collect it by the way, and you will not be deliberate.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

B When the collider is put into use, you will encounter a lack of power at this time, and the solar energy is 5-6 rows * around the equator, about 1300 or so, and this power supply can support you until the small sun. (Note that the "orbital collector" of the supermarket needs a fully charged accumulator, so the electricity load of the home planet should be guaranteed to be greater than 100% at all times)

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

C The production route of the high-efficiency warper is planned in advance, and the formula is changed to change the production after the green sugar comes out.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

D In order to use it efficiently, the idea of setting up the warper in the logistics tower is: only one logistics tower "interstellar demand & local supply" is set up on a planet, with a maximum of 300. All other logistics towers are equipped with "Interstellar Warehousing & Local Demand", with a maximum of 100.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

E Long-distance detection does not come out, look for black holes, and establish a supply chain of unipolar magnets (particle containers). The demand for particle containers in supermarkets is large in the early stage, and the demand is not much after the production of goods is saturated in the later stage, so it is most urgent to establish a monopolar magnet (particle container) supply chain when the warping comes out.

PS: Regardless of whether the detection is full or not, the black hole is not displayed in the starry sky, and only at close range will it be displayed in the first perspective.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

F Bring enough gaseous collectors to find gaseous hydrogen/heavy hydrogen resources.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

G The crystallization of spiny bamboo shoots makes "carbon nanotubes" extremely simple. Most of this stuff is on the seabed and needs to be filled in, and there are a small number of land in the tidal flat type, but the number is pitiful.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

3. Dyson sphere construction. That is, the construction of the Dyson sphere galaxy is not the core, and the problem of science and technology clearance, the supply of dark matter energy bars, solar sails, and small rockets is solved. Specifically, there are 3 tasks:

* Tech clearance (the goal is a sense of achievement)

* Establishment of a solar sail production base (with the aim of obtaining dark matter through the Dyson cloud)

* Establish a small rocket production base (the purpose is to improve the efficiency of dark matter acquisition through the Dyson sphere)

* Dark matter energy bar supply chain (the purpose is to use the small sun to solve the power problem between the stars)

1. Preparation: Check the items and select the galaxy

1) Check the items: Check your supermarket "solar panel" production points to ensure production supply according to the target of 1300.

All kinds of infrastructure facilities, equipment, and goods warehouses are full.

2) Select a resource-rich, luminosity galaxy in the star chart. As shown in Fig

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

2. Establish a solar sail production base and launch it to form a Dyson cloud, which has four steps: making solar sails, emitting and receiving photons, and making dark matter. (The purpose is to obtain dark matter back to the home planet technology clearance)

1) Establish a solar sail production base.

The goal is to produce 600 solar sails in 1 minute, understand and achieve it.

The reason why 600 is set is to predict the consumption of 60 small rockets per minute, and the consumption of solar sails at the peak is about 700.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

2.1) Set the parameters of the solar sail, the slope is recommended to be the same as that of the launch planet. Or perpendicular to the incline, both can launch solar sails with maximum efficiency.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

2.2) Layout of the solar sail launcher, one circle of 57 degrees north and south latitude. (57 degrees has been proven to be more efficient)

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

After entering the Dyson sphere construction link, you can add a planet to launch solar sails to increase the speed of sphere construction. The Dyson cloud phase is not necessary for the time being

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

The solar sail can be launched from two planets at the same time, accelerating the construction of the Dyson sphere.

3) Receive photons.

Two turns of the receiver are enough, it is normal to have insufficient power in the early stage, and it is naturally enough after the Dyson sphere is established.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

4) Make dark matter, and build a supply chain. The purpose of the above Dyson cloud is to establish a dark matter supply chain, send dark matter back to the home planet, build a sugar production line, and solve the problem of scientific and technological customs clearance.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

5) The goal is achieved, and the follow-up construction is completed by returning to the home planet. 3 tasks: complete the construction of the supermarket, transform the production of white sugar, study customs clearance, and establish the supply chain of dark matter rods.

5.1) Complete the final supermarket blueprint section and become a complete material supermarket. Finally, there will be flying lines in the supermarket in this area, and there is no way to do it, high-end buildings need too many materials, and the construction of the blueprint has reduced the flying lines to an acceptable level.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

5.2) The sugar production line should be expanded in the original research area, and the technical layout is shown in the figure.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

5.3) Build a dark matter rod supply chain.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

3. Establish a small rocket production base (the purpose is to improve the efficiency of dark matter acquisition through the Dyson sphere)

Finally, the last big infrastructure has begun, remember to choose a planet with high light efficiency as a small rocket production base.

Target a small rocket production area of 60 pcs/min, quantify and understand the task (this is a complex task).

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

3.1) Set up a temporary supermarket on the construction planet based on the quantified list of supplies. (PS: The materials need to fly back and forth 2-3 times to replenish it, according to the list carefully accurate) The small rocket production area has a lot of material needs, and the complexity is high, this supply point is necessary.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

3.2) Solve the power problem in advance. Solar panels, 4 per row, one circle at the equator, about 1200, basically enough for you to support the power problem in the small rocket production area. When it comes time to launch the rocket, there will still be a shortage of power, and at that time it can already be solved with a small sun.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

3.3) During the construction of this small rocket production base, the technology will be automatically cleared.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

3.4) The construction of small rocket production areas is successful, pay attention to independent construction, and the same idea as the construction of various sugar production areas, the supply and production are self-contained (except for solar sails).

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

3.5) Plan the Dyson Sphere 1 satellite and launch a small rocket.

Planning the frame and filling, theoretically, you can draw any pattern you like, let's start with a basic, full-coverage sphere.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

4) At this time, you will encounter a wave of home star problems, due to the depletion of resources or insufficient production of some previous mines, and the small flaws left over from the early stage that require you to fly around to find and solve problems.

There are two clues to the solution to the problem during the outbreak period: clue 1 is the production of various sugars, one by one from the source to the sugar output, the possible problems are eliminated, and all the ore supply is replaced with the interstellar supply of the interstellar tower, regardless of whether it is depleted or not. Clue 2 is to look at the report, which is very important to help you predict the point where the problem will occur, and solve it immediately once the production and consumption do not match.

At this stage, it's a bit like you go from the general manager of a single store (home star construction) to the regional manager (galaxy construction), and then to the headquarters (Dyson sphere construction). The front-line production has been carried out step by step, the division of functions has been ready, and the principle of self-centeredness has been formed. You need to make predictions and integrate and optimize through data and reports. The essence of the game and reality is the same, and it is just an inevitable law of development.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

5) It takes about 10 hours to wait for the Dyson sphere to complete, and you will spend the most leisurely time in the game: while traveling and sightseeing (such as flying into a black hole to see the spectacle of light distortion, landing on the surface of the star to bake the fire, taking X-rays on the surface of the neutron star without dead angles, cyberpunk posing, picking mushrooms on the Red Planet, walking on the grassland, bathing in Mercury, flying Xiao Yi into space junk, etc.), and by the way, establish various resource supplies, anyway, there are not too many resources to come.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

6) Research direction. First click on the "Dyson sphere stress system", and then repeatedly study the "carrier engine", and other research values that require white sugar as raw materials are no longer large, and the marginal utility is decreasing. It should be reminded that the establishment of a Dyson sphere on a new planet does not require a re-study of the "Dyson sphere stress system", and technological development is such a universal approach.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents
"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

The construction is completed with a full envelopment of the Dyson sphere, and the interior looks like this.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

The Dyson sphere which I finished building is surrounded by all, and the outside looks like this.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

The completed Dyson sphere looks like this from a first-person perspective.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

7) In the later stage of the construction of the Dyson sphere 1 star, the demand for solar sails and small rockets has been saturated. At this time, you can choose any planet that looks more pleasing to the eye to build a new Dyson sphere N star, and send it directly to a small rocket, a solar sail, and a small solar logistics tower.

You can use your artistic talent to make any pattern, and you can come up with such a "Davarishi, Ula" theme.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

It is also possible to come up with such a "ultimate mystery of the universe - Tai Chi"

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

Finally, say goodbye to the picture, Davarich, the responsibility of the third-level human civilization is entrusted to you, do it.

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

Attachment 1: Supermarket printout (right click - save as - color play)

"Dyson Sphere Plan" full clearance graphic guide, with supermarket blueprints and tool documents

End of article

Read on