laitimes

Zhang Chi investigated the xinshi street road reconstruction project

author:Nine factions view the world
Zhang Chi investigated the xinshi street road reconstruction project
Zhang Chi investigated the xinshi street road reconstruction project

On November 5, Zhang Chi, secretary of the district party committee, conducted a special investigation on the street reconstruction project in Xinshi. He stressed that it is necessary to strengthen overall planning and coordination, strictly control the quality of the project, go all out to accelerate the progress of project construction, optimize and improve the layout of the road network, and continuously improve the happiness index of the masses. District leaders Hou Lifeng and Du Jinli attended the meeting together.

At the construction site of the Xinshi Street Road Reconstruction Project, Zhang Chi and his party inspected the progress of the project on the spot, learned more about the planning and deployment, and coordinated and solved the problems encountered in the process of promoting the project. It is understood that the xinshi street road reconstruction project is a new road to the zhengda road section, with a total length of 1500 meters. At present, the main construction section is from Guangming Road in the east to the new road section in the west, and the renovation project mainly includes roads, drainage, transportation, lighting, electric power, communication engineering, etc. The road grade is an urban branch road, the design speed is 30km/h, and the width of the red line is 14m. Up to now, the road has basically completed the main construction projects and will be gradually put into use.

Zhang Chi stressed that the improvement of the quality of streets and roads in Xinshi is of great significance to alleviating traffic pressure and enhancing the overall image of the city. He demanded that relevant departments should firmly establish the concept of "one game of chess", strengthen coordination and cooperation, scientifically organize construction, and ensure that the project is completed on time, quality and quantity. It is necessary to do a good job in diverting and guiding the traffic in this section, improve the road capacity, and ensure the production, life, and traffic travel of the masses to the greatest extent. At the same time, for small traders and hawkers along the road, it is necessary to strengthen standardized management and jointly create a livable and workable living environment.

【Source: Shangdang All Media】

Disclaimer: The copyright of this article belongs to the original author, if there is an error in the source or infringement of your legitimate rights and interests, you can contact us through the mailbox, we will deal with it in a timely manner. Email address: [email protected]

Read on